MARS-26-0422 Inspected
Nozzle throat insert, subscale. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/SiC (PIP)
Layup0/45/90/-45 x4
Fiber lotT700-2604-69
Resin lotRS-42B
Printed10/02/2026 00:46
Printed mass56.18 g
PIP cycles done4, mass gain 34.3%
Current stepDimensional inspection
Process history (ION)
| # | Procedure | Completed | Operator | Recorded values |
|---|---|---|---|---|
| 1 | CF3D Print RUN-19268 |
10/02/2026 03:37 | Marisol Vega | Print job ID: J-26-0422, Program: Nozzle throat insert, subscale, Material system: C/SiC (PIP), Layup: 0/45/90/-45 x4, Fiber lot: T700-2604-69, Resin lot: RS-42B, Printed mass (g): 56.18 |
| 2 | Grieve Oven Operation RUN-19271 |
10/03/2026 23:41 | Marisol Vega | Oven program: Post-cure 177C, Cycle start: 2026-10-03T15:27 |
| 3 | Polymer Infiltration and Pyrolysis Cycle RUN-19272 |
10/06/2026 21:20 | Marisol Vega | Cycle number: 1, Mass before infiltration (g): 56.18, Mass after pyrolysis (g): 64.55, Precursor: SMP-10 |
| 4 | GCF Furnace Operation RUN-19275 |
10/06/2026 21:20 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0422-1, Peak setpoint (C): 1200 |
| 5 | Polymer Infiltration and Pyrolysis Cycle RUN-19276 |
10/09/2026 07:54 | Marisol Vega | Cycle number: 2, Mass before infiltration (g): 64.55, Mass after pyrolysis (g): 70.54, Precursor: SMP-10 |
| 6 | GCF Furnace Operation RUN-19278 |
10/09/2026 07:54 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0422-2, Peak setpoint (C): 1000 |
| 7 | Polymer Infiltration and Pyrolysis Cycle RUN-19280 |
10/11/2026 18:37 | Marisol Vega | Cycle number: 3, Mass before infiltration (g): 70.54, Mass after pyrolysis (g): 73.69, Precursor: SMP-10 |
| 8 | GCF Furnace Operation RUN-19281 |
10/11/2026 18:37 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0422-3, Peak setpoint (C): 1000 |
| 9 | Polymer Infiltration and Pyrolysis Cycle RUN-19283 |
10/14/2026 16:19 | Marisol Vega | Cycle number: 4, Mass before infiltration (g): 73.69, Mass after pyrolysis (g): 75.47, Precursor: SMP-10 |
| 10 | GCF Furnace Operation RUN-19285 |
10/14/2026 16:19 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0422-4, Peak setpoint (C): 1000 |
| 11 | Surface grind a-bars RUN-19286 |
10/16/2026 07:34 | Marisol Vega | A-bars cut: 3, Grind wheel: Diamond 120 grit |
| 12 | Dimensional inspection RUN-28730 |
10/16/2026 12:09 | Marisol Vega | CMM report exported: Yes, Program: NTI_THROAT_V1 |
Densification by PIP cycle
Print job
| Job | Machine | Layers | Avg tow tension (N) | Fault events |
|---|---|---|---|---|
| J-26-0422 | CF3D Robot | 12 | 19.95 | 1 |
Oven and furnace cycles
| Cycle | Machine | Started | Peak setpoint (C) | Max soak dev. (C) | Result |
|---|---|---|---|---|---|
| GO-RUN-19271 | Grieve Oven | 10/03/2026 15:27 | 177.0 | 1.60 | Within tolerance |
| GCF-S-0422-1 | Small GCF | 10/06/2026 05:51 | 1,200.0 | 3.60 | Within tolerance |
| GCF-S-0422-2 | Small GCF | 10/08/2026 15:38 | 1,000.0 | 4.30 | Within tolerance |
| GCF-S-0422-3 | Small GCF | 10/11/2026 01:02 | 1,000.0 | 4.20 | Within tolerance |
| GCF-S-0422-4 | Small GCF | 10/13/2026 22:23 | 1,000.0 | 4.80 | Within tolerance |
Inspection
| Feature | Characteristic | Nominal | Measured | Tolerance | Deviation | Result |
|---|---|---|---|---|---|---|
| THROAT_DIA | Diameter | 19.0500 | 19.0599 | 0.0800 | 0.0099 | Within tolerance |
| OD | Diameter | 44.4500 | 44.4836 | 0.1000 | 0.0336 | Within tolerance |
| LENGTH | Distance | 38.1000 | 38.0695 | 0.1500 | -0.0305 | Within tolerance |
| CONC_OD_THROAT | Concentricity | 0.0000 | 0.0191 | 0.0800 | 0.0191 | Within tolerance |
| THK_WALL | Thickness | 12.7000 | 12.6443 | 0.2000 | -0.0557 | Within tolerance |
CMM report MARS-26-0422_20261016_1134.csv, inspected 10/16/2026 11:34
| Region | Sa (um) | Sq (um) | Sz (um) | Sdr % |
|---|---|---|---|---|
| Top face | 3.121 | 3.963 | 32.18 | 4.25 |
| Edge | 3.619 | 4.596 | 29.72 | 7.99 |
| Bottom face | 3.528 | 4.481 | 35.87 | 2.79 |
Height map, optical profilometer. Image stored in blob storage.
Images
Cross-section B, 10/16/2026 12:34
Cross-section B, 10/16/2026 12:44
polished section, 10/16/2026 14:34
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.