MARS Materials Database Miller Advanced Research Solutions Center
Priya Natarajan, Data Administrator
View as Research engineer Data administrator Student intern
Overview / Parts / MARS-26-0449

MARS-26-0449 In process

Hot structure panel. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/C (phenolic, reinfiltrated)
Layup0 x16
Fiber lotT700-2609-21
Resin lotRS-52D
Printed11/01/2026 01:18
Printed mass139.52 g
PIP cycles done1, mass gain 13.6%
Current stepPolymer Infiltration and Pyrolysis Cycle

Process history (ION)

#ProcedureCompletedOperatorRecorded values
1CF3D Print
RUN-19754
11/01/2026 04:02Marisol VegaPrint job ID: J-26-0449, Program: Hot structure panel, Material system: C/C (phenolic, reinfiltrated), Layup: 0 x16, Fiber lot: T700-2609-21, Resin lot: RS-52D, Printed mass (g): 139.52
2Grieve Oven Operation
RUN-19756
11/03/2026 02:24Marisol VegaOven program: Post-cure 177C, Cycle start: 2026-11-02T18:02
3Polymer Infiltration and Pyrolysis Cycle
RUN-19758
11/04/2026 17:02Marisol VegaCycle number: 1, Mass before infiltration (g): 139.52, Mass after pyrolysis (g): 158.51, Precursor: Furfuryl alcohol
4GCF Furnace Operation
RUN-19760
11/04/2026 17:02Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0449-1, Peak setpoint (C): 1200

Densification by PIP cycle

Print job

JobMachineLayersAvg tow tension (N)Fault events
J-26-0449CF3D Robot1221.571

Oven and furnace cycles

CycleMachineStartedPeak setpoint (C)Max soak dev. (C)Result
GO-RUN-19756Grieve Oven11/02/2026 18:02 177.01.90Within tolerance
GCF-S-0449-1Small GCF11/04/2026 03:27 1,200.04.10Within tolerance

Inspection

This part has not been inspected yet.

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.