Overview / Ovens and furnaces / GCF-S-0409-2
Small GCF cycle GCF-S-0409-2 Within tolerance
PIP pyrolysis for part MARS-26-0409. Tolerance during soak: plus or minus 15 C.
Started09/12/2026 02:02
Completed09/12/2026 18:36
Peak setpoint1,000.0 C
Max actual1,004.6 C
Soak370 min
Max soak deviation5.30 C
Readings loaded994 of 994
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.