Overview / Ovens and furnaces / GCF-S-0412-2
Small GCF cycle GCF-S-0412-2 Within tolerance
PIP pyrolysis for part MARS-26-0412. Tolerance during soak: plus or minus 15 C.
Started09/21/2026 05:46
Completed09/21/2026 21:52
Peak setpoint1,000.0 C
Max actual1,004.4 C
Soak342 min
Max soak deviation4.40 C
Readings loaded966 of 966
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.