Overview / Ovens and furnaces / GCF-S-0421-6
Small GCF cycle GCF-S-0421-6 Within tolerance
PIP pyrolysis for part MARS-26-0421. Tolerance during soak: plus or minus 15 C.
Started10/15/2026 20:49
Completed10/16/2026 12:29
Peak setpoint1,000.0 C
Max actual1,004.6 C
Soak316 min
Max soak deviation4.60 C
Readings loaded940 of 940
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.