Overview / Ovens and furnaces / GCF-S-0437-2
Small GCF cycle GCF-S-0437-2 Within tolerance
PIP pyrolysis for part MARS-26-0437. Tolerance during soak: plus or minus 15 C.
Started10/26/2026 06:03
Completed10/26/2026 23:42
Peak setpoint1,000.0 C
Max actual1,004.2 C
Soak435 min
Max soak deviation4.20 C
Readings loaded1,059 of 1,059
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.