MARS Materials Database Miller Advanced Research Solutions Center
Dana Whitaker, Research Engineer
View as Research engineer Data administrator Student intern
Overview / Parts / MARS-26-0444

MARS-26-0444 In process

Nozzle throat insert, subscale. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/SiC (PIP)
Layup0 x16
Fiber lotT700-2607-16
Resin lotRS-57A
Printed10/25/2026 23:41
Printed mass96.06 g
PIP cycles done3, mass gain 37.6%
Current stepPolymer Infiltration and Pyrolysis Cycle

Process history (ION)

#ProcedureCompletedOperatorRecorded values
1CF3D Print
RUN-19684
10/26/2026 02:02Marisol VegaPrint job ID: J-26-0444, Program: Nozzle throat insert, subscale, Material system: C/SiC (PIP), Layup: 0 x16, Fiber lot: T700-2607-16, Resin lot: RS-57A, Printed mass (g): 96.06
2Grieve Oven Operation
RUN-19687
10/27/2026 05:25Marisol VegaOven program: Post-cure 177C, Cycle start: 2026-10-26T21:02
3Polymer Infiltration and Pyrolysis Cycle
RUN-19689
10/29/2026 10:18Marisol VegaCycle number: 1, Mass before infiltration (g): 96.06, Mass after pyrolysis (g): 113.26, Precursor: SMP-10
4GCF Furnace Operation
RUN-19691
10/29/2026 10:18Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0444-1, Peak setpoint (C): 1200
5Polymer Infiltration and Pyrolysis Cycle
RUN-19694
10/31/2026 20:03Marisol VegaCycle number: 2, Mass before infiltration (g): 113.26, Mass after pyrolysis (g): 125.28, Precursor: SMP-10
6GCF Furnace Operation
RUN-19696
10/31/2026 20:03Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0444-2, Peak setpoint (C): 1000
7Polymer Infiltration and Pyrolysis Cycle
RUN-19697
11/03/2026 00:24Marisol VegaCycle number: 3, Mass before infiltration (g): 125.28, Mass after pyrolysis (g): 132.15, Precursor: SMP-10
8GCF Furnace Operation
RUN-19698
11/03/2026 00:24Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0444-3, Peak setpoint (C): 1000

Densification by PIP cycle

Print job

JobMachineLayersAvg tow tension (N)Fault events
J-26-0444CF3D Robot1520.202

Oven and furnace cycles

CycleMachineStartedPeak setpoint (C)Max soak dev. (C)Result
GO-RUN-19687Grieve Oven10/26/2026 21:02 177.01.80Within tolerance
GCF-S-0444-1Small GCF10/28/2026 17:43 1,200.05.40Within tolerance
GCF-S-0444-2Small GCF10/31/2026 03:54 1,000.05.50Within tolerance
GCF-S-0444-3Small GCF11/02/2026 10:44 1,000.05.10Within tolerance

Inspection

This part has not been inspected yet.

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.