MARS Materials Database Miller Advanced Research Solutions Center
Dana Whitaker, Research Engineer
View as Research engineer Data administrator Student intern
Overview / Ovens and furnaces / GCF-S-0417-6

Small GCF cycle GCF-S-0417-6 Within tolerance

PIP pyrolysis for part MARS-26-0417. Tolerance during soak: plus or minus 15 C.
Started10/10/2026 16:12
Completed10/11/2026 08:42
Peak setpoint1,000.0 C
Max actual1,004.3 C
Soak366 min
Max soak deviation4.70 C
Readings loaded990 of 990
Coverage100.0%
Setpoint and actual temperature

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.