MARS Materials Database Miller Advanced Research Solutions Center
Aaliyah Brooks, Student Intern
View as Research engineer Data administrator Student intern
Overview / Parts / MARS-26-0410

MARS-26-0410 Inspected

Hot structure panel. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/C (phenolic, reinfiltrated)
Layup0/60/-60 x6
Fiber lotT700-2610-82
Resin lotRS-43A
Printed09/09/2026 08:03
Printed mass72.43 g
PIP cycles done3, mass gain 23.5%
Current stepDimensional inspection

Process history (ION)

#ProcedureCompletedOperatorRecorded values
1CF3D Print
RUN-19017
09/09/2026 10:33Marisol VegaPrint job ID: J-26-0410, Program: Hot structure panel, Material system: C/C (phenolic, reinfiltrated), Layup: 0/60/-60 x6, Fiber lot: T700-2610-82, Resin lot: RS-43A, Printed mass (g): 72.43
2Grieve Oven Operation
RUN-19020
09/10/2026 15:34Marisol VegaOven program: Post-cure 177C, Cycle start: 2026-09-10T07:33
3Polymer Infiltration and Pyrolysis Cycle
RUN-19022
09/12/2026 21:28Marisol VegaCycle number: 1, Mass before infiltration (g): 72.43, Mass after pyrolysis (g): 81.82, Precursor: Furfuryl alcohol
4GCF Furnace Operation
RUN-19025
09/12/2026 21:28Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0410-1, Peak setpoint (C): 1200
5Polymer Infiltration and Pyrolysis Cycle
RUN-19028
09/15/2026 13:16Marisol VegaCycle number: 2, Mass before infiltration (g): 81.82, Mass after pyrolysis (g): 86.37, Precursor: Furfuryl alcohol
6GCF Furnace Operation
RUN-19030
09/15/2026 13:16Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0410-2, Peak setpoint (C): 1000
7Polymer Infiltration and Pyrolysis Cycle
RUN-19031
09/17/2026 21:35Marisol VegaCycle number: 3, Mass before infiltration (g): 86.37, Mass after pyrolysis (g): 89.44, Precursor: Furfuryl alcohol
8GCF Furnace Operation
RUN-19032
09/17/2026 21:35Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0410-3, Peak setpoint (C): 1000
9Surface grind a-bars
RUN-19034
09/20/2026 00:59Marisol VegaA-bars cut: 3, Grind wheel: Diamond 120 grit
10Dimensional inspection
RUN-25460
09/21/2026 01:34Marisol VegaCMM report exported: Yes, Program: MARS_ABAR_V2

Densification by PIP cycle

Print job

JobMachineLayersAvg tow tension (N)Fault events
J-26-0410CF3D Robot1619.281

Oven and furnace cycles

CycleMachineStartedPeak setpoint (C)Max soak dev. (C)Result
GO-RUN-19020Grieve Oven09/10/2026 07:33 177.01.70Within tolerance
GCF-S-0410-1Small GCF09/12/2026 07:09 1,200.04.40Within tolerance
GCF-S-0410-2Small GCF09/14/2026 19:29 1,000.05.00Within tolerance
GCF-S-0410-3Small GCF09/17/2026 06:46 1,000.04.60Within tolerance

Inspection

FeatureCharacteristicNominalMeasuredToleranceDeviationResult
LENGTHDistance152.4000152.3626 0.2500-0.0374Within tolerance
WIDTHDistance25.400025.5085 0.15000.1085Within tolerance
THK_1Thickness4.80004.8167 0.20000.0167Within tolerance
THK_2Thickness4.80004.7628 0.2000-0.0372Within tolerance
THK_3Thickness4.80004.7207 0.2000-0.0793Within tolerance
FLAT_TOPFlatness0.00000.0021 0.10000.0021Within tolerance
HOLE_1Diameter6.35006.3269 0.0500-0.0231Within tolerance
HOLE_2Diameter6.35006.3825 0.05000.0325Within tolerance
CMM report MARS-26-0410_20260921_0059.csv, inspected 09/21/2026 00:59
RegionSa (um)Sq (um)Sz (um)Sdr %
Top face1.7392.20913.766.24
Edge1.3561.72214.043.54
Bottom face1.5501.96916.466.74
Height map from the optical profilometer
Height map, optical profilometer. Image stored in blob storage.

Images

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.