MARS Materials Database Miller Advanced Research Solutions Center
Aaliyah Brooks, Student Intern
View as Research engineer Data administrator Student intern
Overview / Parts / MARS-26-0438

MARS-26-0438 In process

Leading edge coupons, C/SiC. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/SiC (PIP)
Layup0/90 x12
Fiber lotT700-2610-25
Resin lotRS-55A
Printed10/21/2026 02:18
Printed mass158.23 g
PIP cycles done5, mass gain 35.4%
Current stepSurface grind a-bars

Process history (ION)

#ProcedureCompletedOperatorRecorded values
1CF3D Print
RUN-19555
10/21/2026 05:53Marisol VegaPrint job ID: J-26-0438, Program: Leading edge coupons, C/SiC, Material system: C/SiC (PIP), Layup: 0/90 x12, Fiber lot: T700-2610-25, Resin lot: RS-55A, Printed mass (g): 158.23
2Grieve Oven Operation
RUN-19557
10/22/2026 14:23Marisol VegaOven program: Post-cure 177C, Cycle start: 2026-10-22T05:39
3Polymer Infiltration and Pyrolysis Cycle
RUN-19560
10/25/2026 12:18Marisol VegaCycle number: 1, Mass before infiltration (g): 158.23, Mass after pyrolysis (g): 182.14, Precursor: SMP-10
4GCF Furnace Operation
RUN-19563
10/25/2026 12:18Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0438-1, Peak setpoint (C): 1200
5Polymer Infiltration and Pyrolysis Cycle
RUN-19565
10/28/2026 04:20Marisol VegaCycle number: 2, Mass before infiltration (g): 182.14, Mass after pyrolysis (g): 197.84, Precursor: SMP-10
6GCF Furnace Operation
RUN-19568
10/28/2026 04:20Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0438-2, Peak setpoint (C): 1000
7Polymer Infiltration and Pyrolysis Cycle
RUN-19570
10/30/2026 07:35Marisol VegaCycle number: 3, Mass before infiltration (g): 197.84, Mass after pyrolysis (g): 207.16, Precursor: SMP-10
8GCF Furnace Operation
RUN-19572
10/30/2026 07:35Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0438-3, Peak setpoint (C): 1000
9Polymer Infiltration and Pyrolysis Cycle
RUN-19573
11/01/2026 04:48Marisol VegaCycle number: 4, Mass before infiltration (g): 207.16, Mass after pyrolysis (g): 211.72, Precursor: SMP-10
10GCF Furnace Operation
RUN-19576
11/01/2026 04:48Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0438-4, Peak setpoint (C): 1000
11Polymer Infiltration and Pyrolysis Cycle
RUN-19579
11/03/2026 13:46Marisol VegaCycle number: 5, Mass before infiltration (g): 211.72, Mass after pyrolysis (g): 214.28, Precursor: SMP-10
12GCF Furnace Operation
RUN-19580
11/03/2026 13:46Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0438-5, Peak setpoint (C): 1000
13Surface grind a-bars
RUN-19581
11/04/2026 15:22Marisol VegaA-bars cut: 4, Grind wheel: Diamond 120 grit

Densification by PIP cycle

Print job

JobMachineLayersAvg tow tension (N)Fault events
J-26-0438CF3D Robot1321.211

Oven and furnace cycles

CycleMachineStartedPeak setpoint (C)Max soak dev. (C)Result
GO-RUN-19557Grieve Oven10/22/2026 05:39 177.06.40Out of tolerance
GCF-S-0438-1Small GCF10/24/2026 21:53 1,200.03.70Within tolerance
GCF-S-0438-2Small GCF10/27/2026 12:59 1,000.06.10Within tolerance
GCF-S-0438-3Small GCF10/29/2026 17:32 1,000.06.00Within tolerance
GCF-S-0438-4Small GCF10/31/2026 15:16 1,000.03.70Within tolerance
GCF-S-0438-5Small GCF11/03/2026 00:10 1,000.03.80Within tolerance

Inspection

FeatureCharacteristicNominalMeasuredToleranceDeviationResult
LENGTHDistance152.4000152.4781 0.25000.0781Within tolerance
WIDTHDistance25.400025.4588 0.15000.0588Within tolerance
THK_1Thickness4.80004.8250 0.20000.0250Within tolerance
THK_2Thickness4.80004.7935 0.2000-0.0065Within tolerance
THK_3Thickness4.80004.7768 0.2000-0.0232Within tolerance
FLAT_TOPFlatness0.00000.0305 0.10000.0305Within tolerance
HOLE_1Diameter6.35006.3413 0.0500-0.0087Within tolerance
HOLE_2Diameter6.35006.3588 0.05000.0088Within tolerance
CMM report MARS-26-0438_20261105_0022.csv, inspected 11/05/2026 00:22
RegionSa (um)Sq (um)Sz (um)Sdr %
Top face1.3581.72411.378.57
Edge1.3001.6519.785.75
Bottom face1.3431.70512.185.66
Height map from the optical profilometer
Height map, optical profilometer. Image stored in blob storage.

Images

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.