MARS Materials Database Miller Advanced Research Solutions Center
Aaliyah Brooks, Student Intern
View as Research engineer Data administrator Student intern
Overview / Ovens and furnaces / GCF-S-0405-7

Small GCF cycle GCF-S-0405-7 Within tolerance

PIP pyrolysis for part MARS-26-0405. Tolerance during soak: plus or minus 15 C.
Started09/17/2026 01:54
Completed09/17/2026 16:44
Peak setpoint1,000.0 C
Max actual1,004.9 C
Soak266 min
Max soak deviation4.90 C
Readings loaded890 of 890
Coverage100.0%
Setpoint and actual temperature

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.