Overview / Ovens and furnaces / GCF-S-0417-1
Small GCF cycle GCF-S-0417-1 Within tolerance
PIP pyrolysis for part MARS-26-0417. Tolerance during soak: plus or minus 15 C.
Started09/29/2026 01:50
Completed09/29/2026 18:31
Peak setpoint1,200.0 C
Max actual1,204.3 C
Soak311 min
Max soak deviation4.30 C
Readings loaded1,001 of 1,001
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.