MARS Materials Database Miller Advanced Research Solutions Center
Aaliyah Brooks, Student Intern
View as Research engineer Data administrator Student intern
Overview / Ovens and furnaces / GCF-S-0430-4

Small GCF cycle GCF-S-0430-4 Within tolerance

PIP pyrolysis for part MARS-26-0430. Tolerance during soak: plus or minus 15 C.
Started10/21/2026 01:27
Completed10/21/2026 15:03
Peak setpoint1,000.0 C
Max actual1,004.1 C
Soak192 min
Max soak deviation4.10 C
Readings loaded816 of 816
Coverage100.0%
Setpoint and actual temperature

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.