MARS Materials Database Miller Advanced Research Solutions Center
Aaliyah Brooks, Student Intern
View as Research engineer Data administrator Student intern
Overview / Parts / MARS-26-0433

MARS-26-0433 In process

Leading edge coupons, C/SiC. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/SiC (PIP)
Layup0/45/90/-45 x4
Fiber lotT700-2607-23
Resin lotRS-49B
Printed10/18/2026 20:59
Printed mass133.83 g
PIP cycles done6, mass gain 44.6%
Current stepSurface grind a-bars

Process history (ION)

#ProcedureCompletedOperatorRecorded values
1CF3D Print
RUN-19456
10/19/2026 00:28Marisol VegaPrint job ID: J-26-0433, Program: Leading edge coupons, C/SiC, Material system: C/SiC (PIP), Layup: 0/45/90/-45 x4, Fiber lot: T700-2607-23, Resin lot: RS-49B, Printed mass (g): 133.83
2Grieve Oven Operation
RUN-19458
10/20/2026 14:16Marisol VegaOven program: Post-cure 177C, Cycle start: 2026-10-20T05:42
3Polymer Infiltration and Pyrolysis Cycle
RUN-19459
10/23/2026 14:40Marisol VegaCycle number: 1, Mass before infiltration (g): 133.83, Mass after pyrolysis (g): 159.31, Precursor: SMP-10
4GCF Furnace Operation
RUN-19462
10/23/2026 14:40Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0433-1, Peak setpoint (C): 1200
5Polymer Infiltration and Pyrolysis Cycle
RUN-19463
10/25/2026 13:14Marisol VegaCycle number: 2, Mass before infiltration (g): 159.31, Mass after pyrolysis (g): 175.61, Precursor: SMP-10
6GCF Furnace Operation
RUN-19466
10/25/2026 13:14Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0433-2, Peak setpoint (C): 1000
7Polymer Infiltration and Pyrolysis Cycle
RUN-19467
10/27/2026 09:24Marisol VegaCycle number: 3, Mass before infiltration (g): 175.61, Mass after pyrolysis (g): 184.01, Precursor: SMP-10
8GCF Furnace Operation
RUN-19468
10/27/2026 09:24Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0433-3, Peak setpoint (C): 1000
9Polymer Infiltration and Pyrolysis Cycle
RUN-19470
10/29/2026 11:45Marisol VegaCycle number: 4, Mass before infiltration (g): 184.01, Mass after pyrolysis (g): 189.5, Precursor: SMP-10
10GCF Furnace Operation
RUN-19472
10/29/2026 11:45Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0433-4, Peak setpoint (C): 1000
11Polymer Infiltration and Pyrolysis Cycle
RUN-19473
10/31/2026 19:55Marisol VegaCycle number: 5, Mass before infiltration (g): 189.5, Mass after pyrolysis (g): 191.99, Precursor: SMP-10
12GCF Furnace Operation
RUN-19475
10/31/2026 19:55Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0433-5, Peak setpoint (C): 1000
13Polymer Infiltration and Pyrolysis Cycle
RUN-19476
11/03/2026 12:53Marisol VegaCycle number: 6, Mass before infiltration (g): 191.99, Mass after pyrolysis (g): 193.54, Precursor: SMP-10
14GCF Furnace Operation
RUN-19479
11/03/2026 12:53Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0433-6, Peak setpoint (C): 1000
15Surface grind a-bars
RUN-19482
11/04/2026 16:32Marisol VegaA-bars cut: 5, Grind wheel: Diamond 120 grit

Densification by PIP cycle

Print job

JobMachineLayersAvg tow tension (N)Fault events
J-26-0433CF3D Robot1219.101

Oven and furnace cycles

CycleMachineStartedPeak setpoint (C)Max soak dev. (C)Result
GO-RUN-19458Grieve Oven10/20/2026 05:42 177.01.70Within tolerance
GCF-S-0433-1Small GCF10/22/2026 22:25 1,200.04.80Within tolerance
GCF-S-0433-2Small GCF10/24/2026 19:23 1,000.04.70Within tolerance
GCF-S-0433-3Small GCF10/26/2026 19:22 1,000.03.50Within tolerance
GCF-S-0433-4Small GCF10/28/2026 18:51 1,000.04.60Within tolerance
GCF-S-0433-5Small GCF10/31/2026 05:13 1,000.05.60Within tolerance
GCF-S-0433-6Small GCF11/02/2026 19:20 1,000.04.80Within tolerance

Inspection

This part has not been inspected yet.

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.