MARS-26-0449 In process
Hot structure panel. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/C (phenolic, reinfiltrated)
Layup0 x16
Fiber lotT700-2609-21
Resin lotRS-52D
Printed11/01/2026 01:18
Printed mass139.52 g
PIP cycles done1, mass gain 13.6%
Current stepPolymer Infiltration and Pyrolysis Cycle
Process history (ION)
| # | Procedure | Completed | Operator | Recorded values |
|---|---|---|---|---|
| 1 | CF3D Print RUN-19754 |
11/01/2026 04:02 | Marisol Vega | Print job ID: J-26-0449, Program: Hot structure panel, Material system: C/C (phenolic, reinfiltrated), Layup: 0 x16, Fiber lot: T700-2609-21, Resin lot: RS-52D, Printed mass (g): 139.52 |
| 2 | Grieve Oven Operation RUN-19756 |
11/03/2026 02:24 | Marisol Vega | Oven program: Post-cure 177C, Cycle start: 2026-11-02T18:02 |
| 3 | Polymer Infiltration and Pyrolysis Cycle RUN-19758 |
11/04/2026 17:02 | Marisol Vega | Cycle number: 1, Mass before infiltration (g): 139.52, Mass after pyrolysis (g): 158.51, Precursor: Furfuryl alcohol |
| 4 | GCF Furnace Operation RUN-19760 |
11/04/2026 17:02 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0449-1, Peak setpoint (C): 1200 |
Densification by PIP cycle
Print job
| Job | Machine | Layers | Avg tow tension (N) | Fault events |
|---|---|---|---|---|
| J-26-0449 | CF3D Robot | 12 | 21.57 | 1 |
Oven and furnace cycles
| Cycle | Machine | Started | Peak setpoint (C) | Max soak dev. (C) | Result |
|---|---|---|---|---|---|
| GO-RUN-19756 | Grieve Oven | 11/02/2026 18:02 | 177.0 | 1.90 | Within tolerance |
| GCF-S-0449-1 | Small GCF | 11/04/2026 03:27 | 1,200.0 | 4.10 | Within tolerance |
Inspection
This part has not been inspected yet.
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.