Overview / Ovens and furnaces / GCF-S-0430-5
Small GCF cycle GCF-S-0430-5 Within tolerance
PIP pyrolysis for part MARS-26-0430. Tolerance during soak: plus or minus 15 C.
Started10/23/2026 13:36
Completed10/24/2026 05:44
Peak setpoint1,000.0 C
Max actual1,004.7 C
Soak344 min
Max soak deviation4.70 C
Readings loaded968 of 968
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.