Overview / Ovens and furnaces / GCF-S-0445-2
Small GCF cycle GCF-S-0445-2 Within tolerance
PIP pyrolysis for part MARS-26-0445. Tolerance during soak: plus or minus 15 C.
Started11/01/2026 12:57
Completed11/02/2026 06:38
Peak setpoint1,000.0 C
Max actual1,003.2 C
Soak437 min
Max soak deviation3.50 C
Readings loaded1,061 of 1,061
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.