MARS-26-0447 In process
Leading edge coupons, C/SiC. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/SiC (PIP)
Layup0/90 x12
Fiber lotT700-2605-78
Resin lotRS-55C
Printed10/29/2026 00:34
Printed mass86.11 g
PIP cycles done2, mass gain 33.2%
Current stepPolymer Infiltration and Pyrolysis Cycle
Process history (ION)
| # | Procedure | Completed | Operator | Recorded values |
|---|---|---|---|---|
| 1 | CF3D Print RUN-19738 |
10/29/2026 04:04 | Marisol Vega | Print job ID: J-26-0447, Program: Leading edge coupons, C/SiC, Material system: C/SiC (PIP), Layup: 0/90 x12, Fiber lot: T700-2605-78, Resin lot: RS-55C, Printed mass (g): 86.11 |
| 2 | Grieve Oven Operation RUN-19741 |
10/30/2026 21:34 | Marisol Vega | Oven program: Post-cure 177C, Cycle start: 2026-10-30T13:04 |
| 3 | Polymer Infiltration and Pyrolysis Cycle RUN-19743 |
11/01/2026 22:26 | Marisol Vega | Cycle number: 1, Mass before infiltration (g): 86.11, Mass after pyrolysis (g): 104.67, Precursor: SMP-10 |
| 4 | GCF Furnace Operation RUN-19745 |
11/01/2026 22:26 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0447-1, Peak setpoint (C): 1200 |
| 5 | Polymer Infiltration and Pyrolysis Cycle RUN-19746 |
11/03/2026 21:37 | Marisol Vega | Cycle number: 2, Mass before infiltration (g): 104.67, Mass after pyrolysis (g): 114.68, Precursor: SMP-10 |
| 6 | GCF Furnace Operation RUN-19747 |
11/03/2026 21:37 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0447-2, Peak setpoint (C): 1000 |
Densification by PIP cycle
Print job
| Job | Machine | Layers | Avg tow tension (N) | Fault events |
|---|---|---|---|---|
| J-26-0447 | CF3D Robot | 11 | 21.61 | 1 |
Oven and furnace cycles
| Cycle | Machine | Started | Peak setpoint (C) | Max soak dev. (C) | Result |
|---|---|---|---|---|---|
| GO-RUN-19741 | Grieve Oven | 10/30/2026 13:04 | 177.0 | 1.70 | Within tolerance |
| GCF-S-0447-1 | Small GCF | 11/01/2026 07:06 | 1,200.0 | 3.90 | Within tolerance |
| GCF-S-0447-2 | Small GCF | 11/03/2026 04:36 | 1,000.0 | 5.20 | Within tolerance |
Inspection
This part has not been inspected yet.
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.