MARS Materials Database Miller Advanced Research Solutions Center
Dana Whitaker, Research Engineer
View as Research engineer Data administrator Student intern
Overview / Parts / MARS-26-0445

MARS-26-0445 In process

Leading edge coupons, C/SiC. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/SiC (PIP)
Layup0/90 x12
Fiber lotT700-2607-37
Resin lotRS-48A
Printed10/27/2026 06:21
Printed mass82.09 g
PIP cycles done3, mass gain 39.7%
Current stepPolymer Infiltration and Pyrolysis Cycle

Process history (ION)

#ProcedureCompletedOperatorRecorded values
1CF3D Print
RUN-19703
10/27/2026 09:49Marisol VegaPrint job ID: J-26-0445, Program: Leading edge coupons, C/SiC, Material system: C/SiC (PIP), Layup: 0/90 x12, Fiber lot: T700-2607-37, Resin lot: RS-48A, Printed mass (g): 82.09
2Grieve Oven Operation
RUN-19706
10/28/2026 14:49Marisol VegaOven program: Post-cure 177C, Cycle start: 2026-10-28T06:49
3Polymer Infiltration and Pyrolysis Cycle
RUN-19707
10/30/2026 14:18Marisol VegaCycle number: 1, Mass before infiltration (g): 82.09, Mass after pyrolysis (g): 98.63, Precursor: SMP-10
4GCF Furnace Operation
RUN-19710
10/30/2026 14:18Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0445-1, Peak setpoint (C): 1200
5Polymer Infiltration and Pyrolysis Cycle
RUN-19712
11/02/2026 06:38Marisol VegaCycle number: 2, Mass before infiltration (g): 98.63, Mass after pyrolysis (g): 108.42, Precursor: SMP-10
6GCF Furnace Operation
RUN-19715
11/02/2026 06:38Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0445-2, Peak setpoint (C): 1000
7Polymer Infiltration and Pyrolysis Cycle
RUN-19717
11/04/2026 07:27Marisol VegaCycle number: 3, Mass before infiltration (g): 108.42, Mass after pyrolysis (g): 114.69, Precursor: SMP-10
8GCF Furnace Operation
RUN-19720
11/04/2026 07:27Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0445-3, Peak setpoint (C): 1000

Densification by PIP cycle

Print job

JobMachineLayersAvg tow tension (N)Fault events
J-26-0445CF3D Robot1423.112

Oven and furnace cycles

CycleMachineStartedPeak setpoint (C)Max soak dev. (C)Result
GO-RUN-19706Grieve Oven10/28/2026 06:49 177.02.50Within tolerance
GCF-S-0445-1Small GCF10/29/2026 22:01 1,200.04.00Within tolerance
GCF-S-0445-2Small GCF11/01/2026 12:57 1,000.03.50Within tolerance
GCF-S-0445-3Small GCF11/03/2026 18:04 1,000.03.90Within tolerance

Inspection

This part has not been inspected yet.

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.