MARS Materials Database Miller Advanced Research Solutions Center
Aaliyah Brooks, Student Intern
View as Research engineer Data administrator Student intern
Overview / Parts / MARS-26-0440

MARS-26-0440 In process

Leading edge coupons, C/SiC. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/SiC (PIP)
Layup0/90 x8
Fiber lotT700-2607-33
Resin lotRS-52D
Printed10/21/2026 11:38
Printed mass160.48 g
PIP cycles done6, mass gain 42.8%
Current stepPolymer Infiltration and Pyrolysis Cycle

Process history (ION)

#ProcedureCompletedOperatorRecorded values
1CF3D Print
RUN-19603
10/21/2026 14:29Marisol VegaPrint job ID: J-26-0440, Program: Leading edge coupons, C/SiC, Material system: C/SiC (PIP), Layup: 0/90 x8, Fiber lot: T700-2607-33, Resin lot: RS-52D, Printed mass (g): 160.48
2Grieve Oven Operation
RUN-19604
10/23/2026 08:59Marisol VegaOven program: Post-cure 177C, Cycle start: 2026-10-23T00:46
3Polymer Infiltration and Pyrolysis Cycle
RUN-19607
10/25/2026 09:30Marisol VegaCycle number: 1, Mass before infiltration (g): 160.48, Mass after pyrolysis (g): 191.45, Precursor: SMP-10
4GCF Furnace Operation
RUN-19608
10/25/2026 09:30Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0440-1, Peak setpoint (C): 1200
5Polymer Infiltration and Pyrolysis Cycle
RUN-19610
10/27/2026 01:09Marisol VegaCycle number: 2, Mass before infiltration (g): 191.45, Mass after pyrolysis (g): 208.58, Precursor: SMP-10
6GCF Furnace Operation
RUN-19611
10/27/2026 01:09Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0440-2, Peak setpoint (C): 1000
7Polymer Infiltration and Pyrolysis Cycle
RUN-19614
10/29/2026 17:01Marisol VegaCycle number: 3, Mass before infiltration (g): 208.58, Mass after pyrolysis (g): 219.16, Precursor: SMP-10
8GCF Furnace Operation
RUN-19616
10/29/2026 17:01Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0440-3, Peak setpoint (C): 1000
9Polymer Infiltration and Pyrolysis Cycle
RUN-19619
10/31/2026 15:43Marisol VegaCycle number: 4, Mass before infiltration (g): 219.16, Mass after pyrolysis (g): 224.87, Precursor: SMP-10
10GCF Furnace Operation
RUN-19621
10/31/2026 15:43Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0440-4, Peak setpoint (C): 1000
11Polymer Infiltration and Pyrolysis Cycle
RUN-19622
11/02/2026 12:10Marisol VegaCycle number: 5, Mass before infiltration (g): 224.87, Mass after pyrolysis (g): 227.55, Precursor: SMP-10
12GCF Furnace Operation
RUN-19625
11/02/2026 12:10Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0440-5, Peak setpoint (C): 1000
13Polymer Infiltration and Pyrolysis Cycle
RUN-19628
11/04/2026 16:01Marisol VegaCycle number: 6, Mass before infiltration (g): 227.55, Mass after pyrolysis (g): 229.15, Precursor: SMP-10
14GCF Furnace Operation
RUN-19629
11/04/2026 16:01Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0440-6, Peak setpoint (C): 1000

Densification by PIP cycle

Print job

JobMachineLayersAvg tow tension (N)Fault events
J-26-0440CF3D Robot818.761

Oven and furnace cycles

CycleMachineStartedPeak setpoint (C)Max soak dev. (C)Result
GO-RUN-19604Grieve Oven10/23/2026 00:46 177.01.80Within tolerance
GCF-S-0440-1Small GCF10/24/2026 16:14 1,200.04.40Within tolerance
GCF-S-0440-2Small GCF10/26/2026 10:19 1,000.04.50Within tolerance
GCF-S-0440-3Small GCF10/29/2026 00:48 1,000.04.30Within tolerance
GCF-S-0440-4Small GCF10/30/2026 23:24 1,000.04.40Within tolerance
GCF-S-0440-5Small GCF11/01/2026 22:14 1,000.05.40Within tolerance
GCF-S-0440-6Small GCF11/04/2026 02:33 1,000.03.40Within tolerance

Inspection

This part has not been inspected yet.

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.