Overview / Ovens and furnaces / GCF-S-0440-1
Small GCF cycle GCF-S-0440-1 Within tolerance
PIP pyrolysis for part MARS-26-0440. Tolerance during soak: plus or minus 15 C.
Started10/24/2026 16:14
Completed10/25/2026 09:30
Peak setpoint1,200.0 C
Max actual1,204.4 C
Soak346 min
Max soak deviation4.40 C
Readings loaded1,036 of 1,036
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.