MARS-26-0440 In process
Leading edge coupons, C/SiC. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/SiC (PIP)
Layup0/90 x8
Fiber lotT700-2607-33
Resin lotRS-52D
Printed10/21/2026 11:38
Printed mass160.48 g
PIP cycles done6, mass gain 42.8%
Current stepPolymer Infiltration and Pyrolysis Cycle
Process history (ION)
| # | Procedure | Completed | Operator | Recorded values |
|---|---|---|---|---|
| 1 | CF3D Print RUN-19603 |
10/21/2026 14:29 | Marisol Vega | Print job ID: J-26-0440, Program: Leading edge coupons, C/SiC, Material system: C/SiC (PIP), Layup: 0/90 x8, Fiber lot: T700-2607-33, Resin lot: RS-52D, Printed mass (g): 160.48 |
| 2 | Grieve Oven Operation RUN-19604 |
10/23/2026 08:59 | Marisol Vega | Oven program: Post-cure 177C, Cycle start: 2026-10-23T00:46 |
| 3 | Polymer Infiltration and Pyrolysis Cycle RUN-19607 |
10/25/2026 09:30 | Marisol Vega | Cycle number: 1, Mass before infiltration (g): 160.48, Mass after pyrolysis (g): 191.45, Precursor: SMP-10 |
| 4 | GCF Furnace Operation RUN-19608 |
10/25/2026 09:30 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0440-1, Peak setpoint (C): 1200 |
| 5 | Polymer Infiltration and Pyrolysis Cycle RUN-19610 |
10/27/2026 01:09 | Marisol Vega | Cycle number: 2, Mass before infiltration (g): 191.45, Mass after pyrolysis (g): 208.58, Precursor: SMP-10 |
| 6 | GCF Furnace Operation RUN-19611 |
10/27/2026 01:09 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0440-2, Peak setpoint (C): 1000 |
| 7 | Polymer Infiltration and Pyrolysis Cycle RUN-19614 |
10/29/2026 17:01 | Marisol Vega | Cycle number: 3, Mass before infiltration (g): 208.58, Mass after pyrolysis (g): 219.16, Precursor: SMP-10 |
| 8 | GCF Furnace Operation RUN-19616 |
10/29/2026 17:01 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0440-3, Peak setpoint (C): 1000 |
| 9 | Polymer Infiltration and Pyrolysis Cycle RUN-19619 |
10/31/2026 15:43 | Marisol Vega | Cycle number: 4, Mass before infiltration (g): 219.16, Mass after pyrolysis (g): 224.87, Precursor: SMP-10 |
| 10 | GCF Furnace Operation RUN-19621 |
10/31/2026 15:43 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0440-4, Peak setpoint (C): 1000 |
| 11 | Polymer Infiltration and Pyrolysis Cycle RUN-19622 |
11/02/2026 12:10 | Marisol Vega | Cycle number: 5, Mass before infiltration (g): 224.87, Mass after pyrolysis (g): 227.55, Precursor: SMP-10 |
| 12 | GCF Furnace Operation RUN-19625 |
11/02/2026 12:10 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0440-5, Peak setpoint (C): 1000 |
| 13 | Polymer Infiltration and Pyrolysis Cycle RUN-19628 |
11/04/2026 16:01 | Marisol Vega | Cycle number: 6, Mass before infiltration (g): 227.55, Mass after pyrolysis (g): 229.15, Precursor: SMP-10 |
| 14 | GCF Furnace Operation RUN-19629 |
11/04/2026 16:01 | Marisol Vega | Furnace: Small GCF, Furnace cycle ID: GCF-S-0440-6, Peak setpoint (C): 1000 |
Densification by PIP cycle
Print job
| Job | Machine | Layers | Avg tow tension (N) | Fault events |
|---|---|---|---|---|
| J-26-0440 | CF3D Robot | 8 | 18.76 | 1 |
Oven and furnace cycles
| Cycle | Machine | Started | Peak setpoint (C) | Max soak dev. (C) | Result |
|---|---|---|---|---|---|
| GO-RUN-19604 | Grieve Oven | 10/23/2026 00:46 | 177.0 | 1.80 | Within tolerance |
| GCF-S-0440-1 | Small GCF | 10/24/2026 16:14 | 1,200.0 | 4.40 | Within tolerance |
| GCF-S-0440-2 | Small GCF | 10/26/2026 10:19 | 1,000.0 | 4.50 | Within tolerance |
| GCF-S-0440-3 | Small GCF | 10/29/2026 00:48 | 1,000.0 | 4.30 | Within tolerance |
| GCF-S-0440-4 | Small GCF | 10/30/2026 23:24 | 1,000.0 | 4.40 | Within tolerance |
| GCF-S-0440-5 | Small GCF | 11/01/2026 22:14 | 1,000.0 | 5.40 | Within tolerance |
| GCF-S-0440-6 | Small GCF | 11/04/2026 02:33 | 1,000.0 | 3.40 | Within tolerance |
Inspection
This part has not been inspected yet.
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.