MARS Materials Database Miller Advanced Research Solutions Center
Aaliyah Brooks, Student Intern
View as Research engineer Data administrator Student intern
Overview / Parts / MARS-26-0447

MARS-26-0447 In process

Leading edge coupons, C/SiC. Linked through ION run records to print, oven, furnace, inspection and image data.
Material systemC/SiC (PIP)
Layup0/90 x12
Fiber lotT700-2605-78
Resin lotRS-55C
Printed10/29/2026 00:34
Printed mass86.11 g
PIP cycles done2, mass gain 33.2%
Current stepPolymer Infiltration and Pyrolysis Cycle

Process history (ION)

#ProcedureCompletedOperatorRecorded values
1CF3D Print
RUN-19738
10/29/2026 04:04Marisol VegaPrint job ID: J-26-0447, Program: Leading edge coupons, C/SiC, Material system: C/SiC (PIP), Layup: 0/90 x12, Fiber lot: T700-2605-78, Resin lot: RS-55C, Printed mass (g): 86.11
2Grieve Oven Operation
RUN-19741
10/30/2026 21:34Marisol VegaOven program: Post-cure 177C, Cycle start: 2026-10-30T13:04
3Polymer Infiltration and Pyrolysis Cycle
RUN-19743
11/01/2026 22:26Marisol VegaCycle number: 1, Mass before infiltration (g): 86.11, Mass after pyrolysis (g): 104.67, Precursor: SMP-10
4GCF Furnace Operation
RUN-19745
11/01/2026 22:26Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0447-1, Peak setpoint (C): 1200
5Polymer Infiltration and Pyrolysis Cycle
RUN-19746
11/03/2026 21:37Marisol VegaCycle number: 2, Mass before infiltration (g): 104.67, Mass after pyrolysis (g): 114.68, Precursor: SMP-10
6GCF Furnace Operation
RUN-19747
11/03/2026 21:37Marisol VegaFurnace: Small GCF, Furnace cycle ID: GCF-S-0447-2, Peak setpoint (C): 1000

Densification by PIP cycle

Print job

JobMachineLayersAvg tow tension (N)Fault events
J-26-0447CF3D Robot1121.611

Oven and furnace cycles

CycleMachineStartedPeak setpoint (C)Max soak dev. (C)Result
GO-RUN-19741Grieve Oven10/30/2026 13:04 177.01.70Within tolerance
GCF-S-0447-1Small GCF11/01/2026 07:06 1,200.03.90Within tolerance
GCF-S-0447-2Small GCF11/03/2026 04:36 1,000.05.20Within tolerance

Inspection

This part has not been inspected yet.

Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.