Overview / Ovens and furnaces / GCF-S-0427-4
Small GCF cycle GCF-S-0427-4 Within tolerance
PIP pyrolysis for part MARS-26-0427. Tolerance during soak: plus or minus 15 C.
Started10/19/2026 22:10
Completed10/20/2026 14:38
Peak setpoint1,000.0 C
Max actual1,005.7 C
Soak364 min
Max soak deviation5.70 C
Readings loaded988 of 988
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.