Overview / Ovens and furnaces / GCF-S-0427-5
Small GCF cycle GCF-S-0427-5 Within tolerance
PIP pyrolysis for part MARS-26-0427. Tolerance during soak: plus or minus 15 C.
Started10/22/2026 02:12
Completed10/22/2026 19:01
Peak setpoint1,000.0 C
Max actual1,004.4 C
Soak385 min
Max soak deviation4.40 C
Readings loaded1,009 of 1,009
Coverage100.0%
Setpoint and actual temperature
Data as of pipeline run R-20261105-0200, finished 11/05/2026 02:00 Mountain. Tables: mars.gold and mars.ops.